Making a House a Home

Written by Emery on May 12th, 2009

Everything has been on hold for the last few weeks, blog included.  We have been super busy trying to finish the rennovations on our house.  We are trying to get everything done before we move in.  The bathroom is the main thing we are working on and we are almost done with it.

So far…..

  1. Gutted the bathroom
  2. Jack hammered 3 inches of tile and concrete off the bathroom floor.
  3. Added floor joists under bathroom.
  4. Rebuilt 4 layer bathroom floor.
  5. Refinished cast iron tub.
  6. Tiled bathroom.
  7. Fixed 25 year old leak in bathroom.
  8. Cleaned the deck.
  9. Started painting.
  10. Removed carpet.
  11. ……more to come…..

The bathroom is almost done!

We should be able to move in soon.  Oh, and we are still tracking along with P90X too.  It’s awesome and I hate it.  I’ve lost about 7 pounds in two weeks. I wish I could say it was easy but it’s pretty much just hard work.

 

Leave a Comment